Rain-time operation, not rainfall alone, sets wind turbine blade rain-erosion exposure: synchronized disdrometer and SCADA measurements
Abstract. Rain erosion of wind-turbine blade leading edges accumulates while the blades turn in rain, yet exposure assessments prescribe a fixed rotor speed and rarely test how fast the turbines actually turn while it rains. We coupled drop-resolved disdrometer rainfall to the operating records of two whole wind farms over their common observation period: one wetter (Guangxi, 513 mm of reconstructed rainfall) and one drier (Jiangsu, 242 mm). Rain-time operation does not merely refine the exposure estimate; it sets its size. The observed tip speed replaces the fixed 90 m s−1 reference, the rounded value of the fleet's observed operating-speed ceiling. Coupling it in lowers the operation-coupled observed-period index (ESCADA) to 18 % of its fixed-speed value in Guangxi and 47 % in Jiangsu, so that reference overstates exposure by factors of 2.1–5.6. The microphysical input matters far less: replacing the parameterized fall-velocity relation with the measured spectra moves the same index by only 28–38 %. The operating state can therefore change which site appears worse. Under the common reference speed the wetter farm is roughly twice as exposed (E90 0.140 versus 0.066); with operation coupled in, the two point estimates change order (0.0251 versus 0.0311), although their bootstrap intervals overlap and the ranking is not statistically separated. Exposure is concentrated in time: the 10 % most exposed rain intervals carry 75–80 % of the total and the five most exposed rain events 78–90 %. Capping the rain-time tip speed at 80 m s−1 removes 42–58 % of the exposure while touching at most 48 % of rain time, within the model framework and before power-loss or control constraints. Both indices are normalized to a literature reference coating and are screening quantities rather than lifetime predictions, and the threshold relation is extrapolated below its 90–150 m s−1 calibration range. They supply the operational loading term that previous assessments had to assume.
The title of article indicates a research area of interest for publication in the WES journal. Erosion of turbine blades is a challenging topic to investigate in the field. This work is based on SCADA data to identify how often the turbines in two wind farms are in operation during rainy periods. The authors argue that this is important instead of assuming all turbines are in operation and follow their nominal operation. For one wind farm the deviation is much higher than for the other. Reasoning of why this wind farm operates below expectation is not clarified or discussed. The expected erosion impact is not analysed. A key message is how many high erosive episodes are counted during time when more the 80% of the turbines in each wind farm are operating during a 3-month period.
The limitations of the study are too many to provide an article suitable for publication. The measured rain is collected for around 3 months only. This is far too short for assessment of erosion that is a multi-year process. The observed rainfall was collected at distance of several kilometers from one of the wind farms. Weather would likely be different between this wind farm and the measurement site. The treatment of the disdrometer data lack clarity. What is the spectrum data compared to? It seems to be output of accumulated rainfall from the same instruments. The SCADA data are used in average way, for 80% or more of turbines in operation at the same time. It is not clear what this selection criteria are used for. All operating turbines would be exposed to erosion during operation in rainy conditions, independently of the operation of other turbines. So, a range of what would the maximum erosion within the wind farm and minimum as noted from SCADA is not evaluated. This lack of detail somehow contradicts the title of the article that focus on rain-time operation. In summary, the article is suggested to be rejected.