Articles | Volume 11, issue 10
https://doi.org/10.5194/wes-11-3887-2026
https://doi.org/10.5194/wes-11-3887-2026
Research article
 | 
15 Oct 2026
Research article |  | 15 Oct 2026

A multi-stage methodology for wind park inter-array cabling: graph preparation, routing, and sizing

Bernardo Castro Valerio, Pieter M. O. Gebraad, Marc Cheah-Mane, Vinicius A. Lacerda, and Oriol Gomis-Bellmunt

Viewed

Total article views: 1,614 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
1,009 453 152 1,614 175 155
  • HTML: 1,009
  • PDF: 453
  • XML: 152
  • Total: 1,614
  • BibTeX: 175
  • EndNote: 155
Views and downloads (calculated since 16 Mar 2026)
Cumulative views and downloads (calculated since 16 Mar 2026)

Viewed (geographical distribution)

Total article views: 1,614 (including HTML, PDF, and XML) Thereof 1,576 with geography defined and 38 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Saved (final revised paper)

Latest update: 04 Nov 2026
Download
Short summary
Designing inter-array cable networks is a key challenge in wind farm development. This work proposes a methodology that combines graph-based routing with mixed-integer optimisation to determine cable routes and conductor sizes while accounting for spatial constraints and electrical limits. Two strategies are investigated: an integrated optimisation and a sequential approach. The method is tested on routes from existing offshore and onshore wind farms.
Share
Altmetrics
Final-revised paper
Preprint