Field-test of wind turbine by voltage source converter

Nicolás Espinoza and Ola Carlson

Viewed

Total article views: 2,550 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
1,490 997 63 2,550 39 46
  • HTML: 1,490
  • PDF: 997
  • XML: 63
  • Total: 2,550
  • BibTeX: 39
  • EndNote: 46
Views and downloads (calculated since 23 May 2018)
Cumulative views and downloads (calculated since 23 May 2018)

Viewed (geographical distribution)

Total article views: 1,851 (including HTML, PDF, and XML) Thereof 1,773 with geography defined and 78 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 27 Jul 2021
Download
Short summary
An important design criterion for the electric drive system of a wind turbine is the fulfilment of grid codes given by transmission system operators. The grid codes state how wind turbines/farms must behave when connected to the grid in normal and abnormal conditions. A type of testing equipment that comprises the use of fully-rated voltage source converter in back-to-back configuration for grid code testing is proposed. Test results of a 4 MW wind turbine and an 8 MW test equipment are shown.