Articles | Volume 11, issue 9
https://doi.org/10.5194/wes-11-3509-2026
https://doi.org/10.5194/wes-11-3509-2026
Research article
 | 
16 Sep 2026
Research article |  | 16 Sep 2026

Case study of a site-specific design and operation optimization of a wind farm co-located PEM electrolyzer and BESS including degradation

Dustin Frings, Georg Jacobs, Thorsten Reichartz, Thora Potthoff, Lucas Blickwedel, and Martin Knops

Viewed

Total article views: 1,414 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
947 346 121 1,414 124 132
  • HTML: 947
  • PDF: 346
  • XML: 121
  • Total: 1,414
  • BibTeX: 124
  • EndNote: 132
Views and downloads (calculated since 09 Apr 2026)
Cumulative views and downloads (calculated since 09 Apr 2026)

Viewed (geographical distribution)

Total article views: 1,414 (including HTML, PDF, and XML) Thereof 1,371 with geography defined and 43 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 
Latest update: 17 Oct 2026
Download
Short summary
This research developed an optimal design model for hydrogen and battery equipment for a wind farm in northwest Germany. By accounting for equipment aging and part-load efficiency of a polymer electrolyte membrane electrolyzer, the tool provides a realistic economic assessment. Results show that neglecting these effects leads to a significant overestimation of profits. This method offers developers a reliable way to plan renewable hydrogen systems and ensures secure investment decisions.
Share
Altmetrics
Final-revised paper
Preprint