Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Lindsay M. Sheridan, Dmitry Duplyakin, Caleb Phillips, Heidi Tinnesand, Raj K. Rai, Julia E. Flaherty, and Larry K. Berg

Viewed

Total article views: 701 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
480 179 42 701 49 64
  • HTML: 480
  • PDF: 179
  • XML: 42
  • Total: 701
  • BibTeX: 49
  • EndNote: 64
Views and downloads (calculated since 06 May 2024)
Cumulative views and downloads (calculated since 06 May 2024)

Viewed (geographical distribution)

Total article views: 701 (including HTML, PDF, and XML) Thereof 681 with geography defined and 20 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 
Latest update: 22 Jul 2025
Download
Short summary
A total of 12 months of onsite wind measurement is standard for correcting model-based long-term wind speed estimates for utility-scale wind farms; however, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities for distributed wind projects. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to long-term wind speed estimates.