Articles | Volume 6, issue 3
https://doi.org/10.5194/wes-6-949-2021
https://doi.org/10.5194/wes-6-949-2021
Research article
 | 
23 Jun 2021
Research article |  | 23 Jun 2021

Optimal scheduling of the next preventive maintenance activity for a wind farm

Quanjiang Yu, Michael Patriksson, and Serik Sagitov

Viewed

Total article views: 2,559 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
1,843 640 76 2,559 98 111
  • HTML: 1,843
  • PDF: 640
  • XML: 76
  • Total: 2,559
  • BibTeX: 98
  • EndNote: 111
Views and downloads (calculated since 09 Dec 2020)
Cumulative views and downloads (calculated since 09 Dec 2020)

Viewed (geographical distribution)

Total article views: 2,559 (including HTML, PDF, and XML) Thereof 2,512 with geography defined and 47 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 
Latest update: 18 Jan 2026
Download
Short summary
There are two ways to maintain a multi-component system: corrective maintenance, when a broken component is replaced with a new one, and preventive maintenance (PM), when some components are replaced in a planned manner before they break down. This article proposes a mathematical model for finding an optimal time to perform the next PM activity and selecting the components which should be replaced. The model is fast to solve, and it can be used as a key module in a maintenance scheduling app.
Share
Altmetrics
Final-revised paper
Preprint