Articles | Volume 6, issue 3
https://doi.org/10.5194/wes-6-949-2021
https://doi.org/10.5194/wes-6-949-2021
Research article
 | 
23 Jun 2021
Research article |  | 23 Jun 2021

Optimal scheduling of the next preventive maintenance activity for a wind farm

Quanjiang Yu, Michael Patriksson, and Serik Sagitov

Viewed

Total article views: 1,681 (including HTML, PDF, and XML)
HTML PDF XML Total BibTeX EndNote
1,128 498 55 1,681 58 58
  • HTML: 1,128
  • PDF: 498
  • XML: 55
  • Total: 1,681
  • BibTeX: 58
  • EndNote: 58
Views and downloads (calculated since 09 Dec 2020)
Cumulative views and downloads (calculated since 09 Dec 2020)

Viewed (geographical distribution)

Total article views: 1,681 (including HTML, PDF, and XML) Thereof 1,662 with geography defined and 19 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 29 Jan 2025
Download
Short summary
There are two ways to maintain a multi-component system: corrective maintenance, when a broken component is replaced with a new one, and preventive maintenance (PM), when some components are replaced in a planned manner before they break down. This article proposes a mathematical model for finding an optimal time to perform the next PM activity and selecting the components which should be replaced. The model is fast to solve, and it can be used as a key module in a maintenance scheduling app.
Altmetrics
Final-revised paper
Preprint